Case
Groundwater intake: Securing trouble-free water supply
- Maximised reliability
- Reduced opex
- Up to 20% energy savings
Zao Vodokanal, Klin
Find out how a water intake facility in russia has increased water supply while reducing costs thanks to reliable and efficient pump solutions.
The ZAO Vodokanal facility handles water intake for residents in the city of Klin within the Moscow Region. The facility’s old pumps lacked capacity during hours of peak demand, and pump operating conditions had changed after an iron removal plant was put in service in 2009. This plant was designed to solve the problem of poor water quality due to high levels of iron. To replace its old pump equipment and resolve its operational issues, the facility turned to Grundfos for help.