6 questions Basic

ECADEMY test

19 - Prefabricated Pumping Stations

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 3 of 6 Basic

Up to how many pumps can Grundfos Dedicated Controls control?

Question 4 of 6 Basic

How are inlet pipes added to the PS.R stations?

Question 6 of 6 Basic

What is the max. diameter of a PS.G. station?

Question 6 of 6 Basic

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 19 - Prefabricated Pumping Stations

Achieved badges:

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Continue training Go to MyECADEMY

Sorry. You did not pass the 19 - Prefabricated Pumping Stations test this time

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Correct
Q: Where is the submerged to dry installation placed?
A: In a separate hole next to the old pumping station
Correct
Q: What does an IO 113 sensor module do?
A: It protects the motor
Correct
Q: Up to how many pumps can Grundfos Dedicated Controls control?
A: 6
Correct
Q: How are inlet pipes added to the PS.R stations?
A: Added on site with a holedril
Correct
Q: What does it mean that the CUE frequency converter is pre-programmed?
A: It lets you reduce commissioning time significantly
Correct
Q: What is the max. diameter of a PS.G. station?
A: 3000mm