Would you recommend drainage around a building if there was soil of permeability and the groundwater level was above drainage level?

Question 6 of 6 Intermediate

Which inlet options does the Grundfos MULTILIFT offer?

Question 6 of 6 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 4 - Wastewater in commercial buildings

Achieved badges:

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Continue training Go to MyECADEMY

Sorry. You did not pass the 4 - Wastewater in commercial buildings test this time

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Correct
Q: What makes the Grundfos MULTILIFT easy to install?
A: The system comes pre-assembled with a freely adjustable inlet and many other installer benefits
Correct
Q: What are the approaches that can reduce hydrostatic pressure on your building?
A: Constructing a robust foundation, anchoring the building to the underground, or installing a drainage system – or all three in some cases
Correct
Q: Why can it be a challenge to install a pumping pit outside a building when removing grey or black wastewater from below sewage level?
A: A pumping pit installation calls for longer planning and installation time, more excavation time and higher excavation costs, as well as a higher initial investment.
Correct
Q: Would you recommend drainage around a building if there was soil of permeability and the groundwater level was above drainage level?
A: Yes
Correct
Q: How can you tell if you need to establish a drainage system as part of your building project?
A: By conducting a thorough pre-investigation of the conditions of the soil, the groundwater conditions, and the drainage situation on neighbouring lots.
Correct
Q: Which inlet options does the Grundfos MULTILIFT offer?
A: DN50-DN150