6 questions Intermediate

ECADEMY test

31 - Industrial Water Supply Systems

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 1 of 6 Intermediate

How many pumps are estimated to be oversized?

Question 2 of 6 Intermediate

Which of these is a consequence of oversized pumps?

Question 6 of 6 Intermediate

According to a Europump study, how much energy can be saved by means of better system control?

Question 6 of 6 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 31 - Industrial Water Supply Systems

Achieved badges:

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Continue training Go to MyECADEMY

Sorry. You did not pass the 31 - Industrial Water Supply Systems test this time

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Correct
Q: How many pumps are estimated to be oversized?
A: 90%
Correct
Q: Which of these is a consequence of oversized pumps?
A: Both of the above
Correct
Q: What does a pressure boosting system do?
A: Ensure optimal pressure across the entire system
Correct
Q: Which of these isn’t a key feature of a monitoring system
A: The ability to repair pumps from your office
Correct
Q: How do you prevent issues such as cavitation and noise?
A: By sizing the pumps according to load profiles
Correct
Q: According to a Europump study, how much energy can be saved by means of better system control?
A: 20%